Interconnection & DER Siting · Energy
Which feeder can take my project before I pay a study deposit?
Checks a shortlist of distributed-generation sites against the three utilities’ published hosting capacity, and says per site which feeder segments publish at or above the project size, how old each value is, and which sites need a study anyway.
Before you open it
1
2
3
What you'll do in the app
1Read every lane’s datePG&E, SCE and SDG&E published capacity, each with its vintage; SCE’s is flagged overdue.
2Import the shortlistFive Fresno sites at 1,000 kW: 121 segments publish enough, 7 of them over a year old; C and E need a study.
3Take the draftA draft site screen for the Pre-Application Report request: sites, segments and a print sheet.
Demo dataLive PG&E, SCE and SDG&E published hosting capacity; demo sites around Fresno
StandardCPUC Rule 21 · IOU ICA (Res. E-5440)
Runs onStrata, or your existing Esri services
Built fromAn open recipe, in one run with Claude
On your own data
Want this on your own data?
We deliver it for you
We set it up on your data and your rules, load your first layers, and support it on Strata Hosted or Custom.
Delivery, licence and annual supportKeep exploring
All 4 Energy apps →Explore similar apps

Pipeline Integrity Evidence PackWhat can we prove about this pipeline, milepost by milepost?See the app →

Right-of-Way & EncroachmentWhat has been built beside my line since the last class-location study?See the app →

Renewables Siting & YieldWhat does the State's plan say about this site before I option it?See the app →