Interconnection & DER Siting · Energy

Which feeder can take my project before I pay a study deposit?

Checks a shortlist of distributed-generation sites against the three utilities’ published hosting capacity, and says per site which feeder segments publish at or above the project size, how old each value is, and which sites need a study anyway.

Prompt
Before you open it

What you'll do in the app

1
Read every lane’s datePG&E, SCE and SDG&E published capacity, each with its vintage; SCE’s is flagged overdue.
2
Import the shortlistFive Fresno sites at 1,000 kW: 121 segments publish enough, 7 of them over a year old; C and E need a study.
3
Take the draftA draft site screen for the Pre-Application Report request: sites, segments and a print sheet.
Demo dataLive PG&E, SCE and SDG&E published hosting capacity; demo sites around Fresno
StandardCPUC Rule 21 · IOU ICA (Res. E-5440)
Runs onStrata, or your existing Esri services
Built fromAn open recipe, in one run with Claude